minerios.jazidas@gmail.com/ gilmarminerios@gmail.com fone; +55 119 9548 8500 whatsap +5514988087940 whatsap Vivo; +55 11 9 9548 8500
quarta-feira, 22 de junho de 2016
PPP OPERAÇÃO BANCARIAS LASTREADAS EM BG
Disponibilza para operaçoes PPP
SKR. CLN. BG.
LOCAÇAO DE SKR e CLN, BG
VALORES A PEDIDOS DOS LOCADORES PARA P.P.P.
SKR, e CLN.
SKR, 50 Milhoes de Euros,
CLN, ATE, 2BI de Euros.
LOCAÇAO E SKR
SKR -50MILHOES DE EUROS.
LASTREADA EM CLN- BG
7.5MILHOES DE RAIS,
SENDO;
2.5MILHOES DE REAIS ENTRADA.
2.5MILHOES DE REAIS /60 DIAS,
2.5MILHOES DE REAIS /60 DIAS,
15% NA PARCITIPAÇAO DA PPP.
DESPESAS BANCARIAS POR CONTA DOS LOCADORES.
BANCO INTERNACIONAL, COM SEDE EM BRASILIA
terça-feira, 14 de junho de 2016
Copper Cathodes
Copper Cathodes
Copper Cathodes 99.97% to 99.99%
Shipment: 500 MT Each Shipment 4 to 6 Weeks
We can ship Now ATTACHED Photo
Trial Shipment: 40 MT 2 Containers
CIF Price: LME less 25%
Payment Before Shipping to Change Ownership to Load Container ON Board
quarta-feira, 1 de junho de 2016
Tubo excedente disponível / Angola
Tubo excedente disponível / Angola
O material seguinte é disponível entregue ao porto e desalfandegadas em Luanda, Angola.
O vendedor tem expectativas de US $ 400 por tonelada métrica entregue ao porto e
desalfandegadas para pedidos mínimos de 2.000 toneladas métricas. Todo o material é
Tenaris ou Sumitomo 2011-2013
.
Tamanho
|
pés
|
toneladas
|
3 1/2 "9.3 # L80 TSG BL R2
|
24.080,81
|
101,58
|
3-1 / 2 ", 12.95PPF, L80, W533, R2
|
5887,6
|
34,58
|
4 1/2 "15,5 # L80 R2 W533
|
1518,64
|
10,68
|
4-1 / 2 ", 15.50PPF, L80, W533, R2
|
6632,16
|
46.63
|
7 "32 # TN125SS TBD R3
|
4510
|
65,46
|
7 "35 # L80 TB R3
|
9100,36
|
144,48
|
7 "35 # T95 TBD R3
|
3854
|
61,19
|
7 ", 35PPF, T95, TSH BL, R3
|
7626
|
121,07
|
7 ", 32PPF, TN 110HS, TBD, R3
|
7829,36
|
113.64
|
11 3/4 "60 # T95 W513-DPLS R3
|
10.863,36
|
295,66
|
11 3/4 "60 # L80 TSH BNF-DPLS R3
|
2335,36
|
63,56
|
11 3/4 "60 # L80 VAM FJL R3
|
1558
|
42,40
|
11 3/4 ", 65 #, SM125S, VAM SLIJ-11, R3
|
440
|
12,97
|
11 3/4 ", 65 #, SM125S, VAM SLIJ-11, R3
|
1680
|
49,53
|
11-3 / 4 ", 60PPF, L80, TSH BNF, R3
|
4510
|
122,74
|
11-3 / 4 ", 60PPF, T95, W513-DPLS, R3
|
7419,36
|
201,92
|
14 ", 112,6 #, 125S, VAM SLIJ-II, R3
|
5440
|
277,85
|
14 ", 112,6 #, 125S, VAM SLIJ-II, R3
|
400
|
20,43
|
14 ", 112,6 #, 125S, VAM SLIJ-II, R3
|
640
|
32,69
|
16 "84 # P110 TS ER, PXB R3
|
4549,36
|
173,34
|
16 "95 # L80 W523-DPLS R3
|
8157,36
|
351,51
|
16 ", 96 #, Q125HC, HYDRIL511, R3
|
17480
|
761,17
|
16 ", 96 #, Q125HC, HYDRIL511, R3
|
16240
|
707,18
|
16 ", 95PPF, L80, TSH W523-DPLS, R3
|
10.207,36
|
439,85
|
18 ", 119 #, Q125HC, HYDRIL511, R3
|
11320
|
611,03
|
18 ", 119 #, Q125HC, HYDRIL511, R3
|
6400
|
345,46
|
20 "# X56 129,33 3ST gp70 R3
|
9143
|
536,36
|
20 "169 # x56 RL-4S
|
10.788,58
|
827,03
|
20 ", 129,33, X56, RL-4S, 40 pés
|
5917,12
|
347,12
|
22 ", 226 #, P110, TENARIS ER, R3
|
5680
|
582,27
|
22 ", 226 #, P110, TENARIS ER, R3
|
6160
|
631,48
|
22 ", 226 #, P110, TENARIS ER, R3
|
280
|
28.70
|
Total
|
8161,58
|
Assinar:
Postagens (Atom)