sábado, 10 de fevereiro de 2018

Copper ore Nigeria 10.13%

Copper ore 10.13%


origin. Nigeria 

Quantity:
1st month  100MT
2nd month    500MT
3rd month     1000MT
4th Month     5000MT
5th month10000MT
6th Month   20000MT
the rest of the month will be 20,000MT until 12 months

CIF price is every grade with $32.

10.13% x 32 = $324.16 MT
size. 2 MM 
packaging. 50 Kilo/bag

 Chemical Analysis:

Cu.23%, As 0.30%, Pb 3%, Zn 2%, Sb 04%, Hg 0.02%, F 0.03%,CI 0.30%, M90 0.49%, Fe 1.74%, Moisture 2.6%.
We have test report. 

Payment. 100% DLC with 90/10% term

Delivery port. loading port Apapa, Lagos, Nigeria.

CIF Payment Terms: 100% LC after signed and sealed contact between buyer and the seller. Buyer will pay 90% base on test report against all shipping documents including Bill of Lading on loading port and balance 10% at discharge port based on CIQ test report.

Shipment: 100MT are already at the loading port Apapa, Lagos, Nigeria.
Let us know if interested.